Product Description
CA-7403 Product Description:
Name |
Size |
Surface treatment |
Material |
18PC Torx Key Set |
T10,15,20,25,27,30,40,45,50
1.5,2,3,4,5,6,8,10mm |
chrome finish |
CRV, carbon steel |
Introduction of taiwan's advanced technology, made by CR-V
The whole heat treatment and the maximum of hardness can reach HRC57
The surface which is treated by fine sand butyl nickel,beautiful and durable
HEX: 1.5mm 2mm 2.5mm 3mm 4mm 5mm 6mm 8mm 10mm
TORX: T10 T15 T20 T25 T27 T30 T40 T45 T50
We C&A had been dedicated measuring tape for almost 20 years, supplying customer from more than thirty countries. With competitive price and professional service we could support you well.
If you are interested in our products, pls feel free to contact us, we are glad to serve you at any time. We are looking forward to enter into business relationship with you on the basis of mutual benefit. Let's work together to create a valuable and wonderful future!
Notice
1.Keep wearing goggle and face protection while you are doing cutting works!
2.Do not wear loose clothes, jewelry and gloves!
3.Never fit or change the saw blades while the tools is working or the plug is still conecting!
4.Please remember use the right size of saw blade with suitable power tools!
5.This kind carbide saw blade is designed for cutting grass, brush, small tree, bamboo or other
Similar things. Do not use it for cutting concrete, stone, metal or other similar material!
We control the quality not only at the final process. From buying material to delivery, our QC department check quality in every process.
Transportation
Goods can be delivered by land carriage, by air, or by sea transportation.
Company Profile
Company Show
FAQ
Q1: Are you a manufacturer or trading company?
A1: We have factory of hammer, and we also do trade for decades. If you have other inquiry about hand tools, please be free to send us inquiry!
Q2: What is the lead time?
A2: In a general way, it takes 45 days after received the deposit.
Q3: Can you do our brand?
A3: Yes, we can do OEM.
Q4: What's your payment terms?
A4: We prefer T/T, 30% T/T depostit and balance paid off before shipment.